Abu Saeed Bridge
The construction of Abu Saeed steel bridge ended in 2011 in the historical part of the capital city in Iran. The length of that is 175 meters, which consist of six piers. Persian Vira vision wanted to illuminate the Abu Saeed Bridge with an LED lighting installation that could provide color-changing effects, creating a new landmark for the city and an awesome experience for Tehran visitors. The team chose different type of full-color LED nodes known for their ability to provide direct-view lighting designs with intense and vibrant colors. The smart lighting of this project ended in 2013.